Solar

Solarpark Bison Solar

Kapazität:
36,31 MW
Jahresertrag:
61 Mio. kWh
Land:
220
Region:
Colorado
Inbetriebnahme:
2016
Module:
117120

The 30 Megawatt (MW) Bison Solar Project achieved substantial completion in October 2016. The Project is located in north Wellington, Colorado, and was constructed by JSI Construction Group, the Engineering, Procurement, and Construction (EPC) Contractor. The Bison Solar facility is built adjacent to the Platte River Power Authority – Rawhide Energy Station; a 200 plus MW coal facility. Bison Solar LLC owns the facility and will be operated by the JSI O&M Group. The Bison Solar Project includes more than 117,000 panels, and generate power for approximately 5,000 average size residential homes in Colorado.

  • Construction Began in February 2016
  • Commercial operation was achieved in October 2016
  • Includes 117,120 modules constructed on the juwi (JES) single axis tracker
  • Project Owner: Bison Solar LLC (PSEG Solar Source)
  • Annual generation (avg) 61,000 MWh

Zurück zur Übersicht

Weitere Themen

Neuste Artikel

World's top utility-scale solar constructors list - juwi auf Platz 4

Dank neuer Märkte wie Ägypten, Vietnam und Australien verändert sich die Rangliste der weltweit... mehr

juwi und STAWAG führen Kooperation fort

Unternehmen wollen gemeinsam weitere Windenergieprojekte in der Region um Aachen entwickeln. mehr

CEE Group erwirbt 14,4 MW juwi-Jubiläumswindpark Mohlis

Unternehmen unterzeichnen Kaufvertrag für vier Anlagen vom Typ Vestas V136-3.6 auf HusumWind 2019. mehr